Sign up to receive email updates when new content is posted.
Desert Region
Notice of Availability/Notice of Intent
Initial Study – Mitigated Negative Declaration
Appendix B – Habitat and Jurisdictional Assessment
Appendix C – Cultural Resources Assessment
Appendix D – Subsurface Explorations and Geotechnical Investigation
Appendix E – Hazardous Materials Technical Memo
Appendix F – Preliminary Hydrology Report
Appendix G – Traffic Assessment
Appendix H – Native American Tribal Consultation Correspondence
Final Initial Study/Mitigated Negative Declaration
Initial Study- Mitigated negative declaration (ISMND)
Appendix F- San Bernardino County Certificate of Land Use (Vesting ) Approval
Bagdad Chase Reclamation Plan Sheet 1 of 4
Bagdad Chase Reclamation Plan Sheet 2 of 4
Draft EIR
Appendices, Cover, Title and Table of Contents
Introduction to Environmental Analysis
Aesthetics and Visual Resources
Effects Found Not To Be Significant
Agriculture and Forestry Resources
Cultural Tribal Paleo Resources
Hazards and Hazardous Materials
Alternatives to the Proposed Project
Appendices
Appendix A- NOP and Public Comments Received
Appendix B-1- Visual Impact Assessment
Appendix B2- Addendum to Visual Impact Analysis
Appendix C- LESA Technical Memorandum
Appendix D1- Air Quality Technical Report
Appendix D2- Dust Control Technical Memo
Appendix E1- Biological Resources Technical Report
Appendix E2 – 2018 Spring Summer Survey Report
Appendix E3- Desert Tortoise Pre-Project Survey
Appendix E4- Jurisdictional Delineation Report
Appendix E5 – Special Status Plant Species Survey
Appendix F2 – Paleontological Resources Technical Memorandum
Preliminary Geotechnical Engineering Report
Appendix H1- Phase I Environmental Site Assessment 1 of 10
Appendix H1- Phase I Environmental Site Assessment 2 of 10
Appendix H1- Phase I Environmental Site Assessment 3 of 10
Appendix H1- Phase I Environmental Site Assessment 4 of 10
Appendix H1- Phase I Environmental Site Assessment 5 of 10
Appendix H1- Phase I Environmental Site Assessment 6 of 10
Appendix H1- Phase I Environmental Site Assessment 7 of 10
Appendix H1- Phase I Environmental Site Assessment 8 of 10
Appendix H1- Phase I Environmental Site Assessment 9 of 10
Appendix H1- Phase I Environmental Site Assessment 10 of 10
Appendix H2 – Technical Memo_ RECs Identified in Phase I ESA
Appendix H3 – Airport Safety and Compatibility Technical Memorandum
Appendix I1 – Preliminary Hydrology Study and Flood Analysis1 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis2 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis3 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis4 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis5 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis6 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis7 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis8 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis9 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis10 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis11 of 12
Appendix I1 – Preliminary Hydrology Study and Flood Analysis12 of 12
Appendix I2 – Addendum to Preliminary Hydrology- 1 of 2
Appendix I2 – Addendum to Preliminary Hydrology- 2 of 2 c
Appendix I3 – Water Supply Assessment 1 of 2
Appendix I3 – Water Supply Assessment 2 of 2
Appendix J – Solar Sound Survey and Analysis Report
Appendix K – Traffic Assessment and Trip Generation
Notice of Preparation of Draft EIR and Scoping Meeting (Updated March 27, 2018)
Final Environmental Impact Report ( 1/5/24)
Draft Environmental Impact Statement (DEIR)
Appendix A: NOP and Comment Letters
Appendix C: Air Quality Memorandum
Appendix D: Biological Resources Assessment
Appendix E: Cultural Resources Assessment
Appendix F: Energy Technical Memorandum
Appendix G-1: Desktop Geotechnical Review Report
Appendix G-2: Geotechnical Engineering Report
Appendix G-3: Paleontological Resource Assessment
Appendix H: GHG Emissions Technical Memorandum
Appendix I-1: Desert Breeze Phase I ESA
Appendix I-2: Lockhart SEGS Phase 1 ESA
Appendix J: Preliminary Drainage Study Technical Memorandum
Appendix K: Noise Technical Memorandum
Appendix L: Transportation Assessment Technical Memorandum
Appendix M: Tribal Cultural Resources Documentation
Notice of Availability (10/20/23)
Initial Study/ Mitigated Negative Declaration
Appendix 1a- Final BRA-JD-NPPP
Appendix 1b-CDFG 2012 Staff Reports on BUOW Mitigation
Previous Documents:
Notice of Availability/Notice of Intent
Initial Study/Mitigated Negative Declaration
Biological Resources Assessment
Appendix A – Air Quality Technical Memorandum
Appendix B – Biological Resource Assessment
Appendix C – Desert Tortoise Survey Report
Appendix D – Rare Plant Survey
Appendix E – Western Joshua Tree Survey Report
Appendix F – Jurisdictional Delineation
Appendix G – Cultural Resources Technical Report
Appendix H – Energy Documentation
Appendix I – Geotechnical Engineering Investigation
Appendix J – Greenhouse Gas Emissions Technical
Appendix L – Preliminary Drainage Report
Notice of Determination (NOD) (Updated 6/30/2022)
Final EIR (Updated 4/8/2022)
Notice of Preparation (Updated 7/14/21)
Appendix C- Air Quality Technical Memorandum
Appendix D-1- Biological Resources Assessment
Appendix D-2- Mojave Ground Squirrel Habitat Assessment
Appendix E- Cultural Resources Report
Appendix F- Energy Technical Memorandum
Appendix G-1- Geotechnical Investigation Report
Appendix G-2- Supplemental Memorandum
Appendix H- GHG Emissions Technical Memorandum
Appendix I-1- 2020 Phase I ESA
Appendix I-2- 2021 Phase I ESA
Appendix I-3- Shallow Soil Investigation Report
Appendix J- Preliminary Hydrology Report
Appendix K- Noise Technical memorandum
Notice of Preparation of Draft EIR and Scoping Meeting
Notice of Availability/Notice of Intent
Draft Environmental Impact Report
Appendix A: Notice of Preparation and Comment Letters
Appendix B: Visual Simulations
Appendix C: Air Quality and GH Technical Report
Appendix D: Biological Resources Technical Report
Appendix E: Cultural Resource Assessment
Appendix F – Geotechnical Investigation.
Appendix F2: Geological Fault Investigation
Appendix F3: Gentie Geotechnical Investigation
Appendix G: Paleontological Resource Assessment
Appendix I: Stormwater Drainage Report
Appendix J: Water Supply Assessment
Air Quality and Greenhouse Gas Impact Study
Biological Resources Assessment and Jurisdictional Delineation
Design Phase Geotechnical Report Part 1
Design Phase Geotechnical Report Part 2
Design Phase Geotechnical Report Part 3
Fault Rupture Hazard Investigation
Paleontological Resources Assessment Report
Historical Archaeological Resources Survey
Appendix A – Air Quality Technical Memorandum
Appendix B – Biological Resource Assessment
Appendix C – Desert Tortoise Survey Report
Appendix D – Mojave Ground Squirrel Protocol Survey Report
Appendix E – Rare Plant Survey Report
Appendix F – Western Joshua Tree Survey Report
Appendix G – Cultural Resources Identification Report
Appendix H – Energy Documentation
Appendix I – Geotechnical Engineering Investigation
Appendix J – Greenhouse Gas Emissions Technical
Appendix L – Preliminary Drainage Report
Draft Environmental Impact Report (DEIR)
Appendix A – NOP, Scoping Meeting Materials, and Comments
Appendix B – Vidal Character Photos
Appendix C – Air Quality and Greenhouse Gas Emissions Impact Analysis
Appendix D – Biological Resources Report
Appendix E – Cultural Resources Survey Report
Appendix F – Preliminary Geotechnical Engineering Report
Appendix G – Environmental Database Report
Appendix B – Biological Resources Assessment
Appendix C-1 – Phase I Cultural Resources Assessment
Appendix C-2 – SCCIC CHRIS Records Research
Appendix D-1 – Geotechnical Engineering Investigation
Appendix D-2 – Soils Report Addendum Septic Feasibility Letter
Appendix D-3 – Paleontological Resources Review
Appendix E-1 – Onsite Drainage Study
Appendix E-2 – Onsite Drainage Calculations
Appendix E-3 – Offsite Hydrology Study
Appendix G – Traffic Impact Study
Appendix H – Native American Tribal Consultation Correspondence