Desert Region Environmental Archive
Projects A-L
Appendix A – Bowman Solar Photo Simulations
Appendix B – Bowman Solar – Plant Inspection
Appendix B – Bowman Solar – Rare Plant Survey
Appendix B – Bowman Solar – Biological Resource Assessment
Appendix B – Bowman Solar – Burrowing Owl Survey
Appendix B – Bowman Solar – Desert Tortoise Survey
Appendix C – Bowman Solar – Cultural Resources Assessment
Appendix D – Bowman Solar – Geologic Investigation Report
Appendix E – Bowman Solar – Drainage Report
If you wish to view Notice of Availability, Notice of Intent, Negative Declaration, and Initial Study, click here.
Appendix A – Notice of Preparation, Public Comment Letters, and Initial Study
Appendix B – Air Quality Analysis
Appendix C – Focused Biological Survey and Jurisdictional Delineation
Appendix D – Focused Biological Survey and Jurisdictional Delineation for Offsite Improvements
Appendix E – Joshua Tree Survey Report and Management Plan
Appendix F – Geotechnical Investigation
Appendix G – Phase I Environmental Site Assessment – Fairview Creek and Granite Valley
Appendix J – Public Services and Utilities Letters
Appendix K – Water Supply Assessment and Water Resources Study
Appendix L – Traffic Impact Analysis
Appendix A – Air Quality and Greenhouse Gas Impact Analysis Update and Peer Review
Appendix B – Biological Circumstances 2013 and Peer Review
Appendix D – Geotechnical Update
Appendix E – Noise Impact Analysis Review
Appendix F – Traffic Analysis Adequacy Review and Peer Review
Appendix G – Status and Validity of Water Supply Assessment and Water Supply Verification
Appendix H – Water Supply Assessment and Water Supply Verification
Appendix I – Supplemental Traffic and Air Quality Analysis-2011
Notice of Availability (July 28, 2011).
If you wish to review the Initial Study, click here.
Notice of Preparation (Signed)
Notice of Preparation Comment Letters
Draft Environmental Impact Report
Judgment Granting Peremptory Writ of Mandate
Ruling on Petition for Writ of Mandate
Appendix A Air Quality and Greenhouse Gas Emissions CalEEMod Output Sheets
Appendix B Biologist Letter Part 1 and Part 2
Appendix C Burrowing Owl Habitat
Appendix D Archaeological Information Center-Historical Resources Review
Appendix E Native American Heritage Commission Sacred Lands File Search
Appendix F Geotechnical Report
Appendix G Geotechnical Grading Plan Review
Appendix H Preliminary Water Quality Management Plan
Appendix I Phase I Environmental Assessment
Appendix J Traffic Generation Analysis
Appendix K Joshua Basin Water District Form W1 Public Water Certification
If you wish to view the Final EIR and Errata, click here (July 2011).
If you wish to review the Draft Environmental Impact Report, click here.
Appendix A – Notice of Preparation and Public Comment Letters
Appendix B – Mitigated Negative Declaration and Initial Study
Appendix C – Traffic Impact Analysis and Traffic Impact Analysis Appendices A thru N
Appendix D – Botanical and Habitat Survey and Focused Biological Survey
Appendix E – Additional Biological Resources Reports
Notice of Preparation (January 29, 2009) of environmental impact report for the Lewis Operating Corporation, LHC Alligator, LLC, Deep Creek (Apple Valley) Project.
If you wish to review the Revised and Recirculated Notice of Preparation for the Deep Creek EIR, click here.
Notice of Availability (December 8, 2010) of the revised and recirculated section 4.2, biological resources for the Lewis Operating Corporation Deep Creek (Apple Valley) Project.
If you wish to review the Section 4.2 (Revised and Recirculated) Biological Resources, click here.
Notice of Preparation (July 27, 2007)
Mitigated Negative Declaration Form
Mitigated Negative Declaration Form
Mitigated Negative Declaration Form
Appendices
Appendix A Longboat Solar Draft
Appendix B1 Longboat AQ-GHG Assessment
Appendix B2 Longboat HRA Report
Appendix D2 Final Cultural Resources Supplement
Appendix E Longboat geotechnical report
Appendix F1 Final Phase I ESA-Longboat Solar
Appendix H Longboat Acoustical Report
Appendix I Longboat Transportation and Traffic Assessment April 2015
Notice of Availability and Notice of Intent (revised 11/19/2013)
Projects M-Z
Additional Information :
Description of Proposed Action and Alternatives- Revised
Chapter 2 Description of Proposed Action and Alternatives
Chapter 3.3 Biological Resources
Chapter 3.4 Cultural Heritage Resources
Chapter 3.5 Geology Soils Minerals
Chapter 3.7 Hazards and Hazardous Materials
Chapter 3.8 Hydrology and Water Quality
Chapter 4 Other Required Sections
Chapter 5 Consultation-Coordination
Appendices
Appendix A-1 – Scoping Report
Appendix A-2 – Initial Study
Appendix B-1- Air Quality Report
Appendix B-2 – Supplemental Air Quality Report
Appendix B-3 – HRA for Potential Off Site Limestone Quarries
Appendix C – BA-BE and Raptor Conservation Strategy
Appendix D-1 – Jurisdictional Delineation Report
Appendix D-2 – Updated JD Impact Memo
Appendix E – Cushenbury Springs Hydrogeologic Evaluation
Appendix F – Geology-Soils-Hydro-WQ
Appendix G – Hazardous Materials Technical Report
Appendix H – Water Supply Assessment
Appendix J – Recreation Analysis
Appendix L – Responses to Comments
Appendix M – Mitigation Monitoring and Reporting Program
Appendix N – Material Safety Data Sheets for Dust Suppressants
Mojave Narrows Chateau Initial Study
Preliminary Geotechnical Report
Appendix A: CalEEMod Annual Report
Appendix A: CalEEMod Summer Report
Appendix A: CalEEMod Winter Report
Appendix A: GHG Screening Table
Appendix C: Jurisdictional Delineation
Appendix D: Phase 1 Cultural Assessment
Appendix E: Non-Confidential – Final Archaeological Resources Testing & Evaluation Report
If you wish to view the Water Supply Assessment Addendum II (August 11, 2011), click here
Appendix A, Water Supply Assessment
Appendix B, Water Supply Assessment Addendum
Appendix C, 2010 Urban Water Management Plan
Appendix D, Judgment After Trial
Appendix E, Minute Order from Court
Appendix F, Supplemental Preemptory Writ
Appendix G, Reporter Transcript
Notice of Availability for the Draft Supplemental Environmental Impact Report for Nursery Products Hawes Composting Facility July, 2009)
To view the Court Decision of April 11, 2008, click here
To view the Draft Supplemental Environmental Impact Report, click here.
Appendix A, Response to Comments
Appendix B, Global Climate Change Analyses
Appendix C, Water Supply Assessment
Appendix D, Economic Feasibility
Notice of Hearing (November 16, 2009)
To view the Final Supplemental Environmental Impact Report, click here.
To view the Water Supply Assessment Addendum, click here.
Notice of Preparation (March 10, 2009)
Nursery Products Approval (April 10, 2007)
Notice of Completion (November 21, 2006))
If you wish to review the Final EIR, click on one of the following links.
Notice of Preparation (June 6, 2006))
If you wish to review the Initial Study, click here
If you wish to review the Vicinity Map click here.
If you wish to review the Project Location Map, click here.
Notice of Availability (September 26, 2006)
Notice of Extension (October 19, 2006)
If you wish to review the Draft EIR, click here.
To view the Appendices, click on the appropriate appendix listed below.
Joint Notice of Preparation and Notice of Intent
Notice of Preparation Extension
Amended Plan of Operations and Reclamation Plan
Appendix 1A Decision Notice and Finding
Appendix 1B Approved Reclamation Plan
Appendix 2 Sentinel Quarry Expansion EA
Appendix 3A AQ Permits Sentinel Quarry
Appendix 3B Patterns of Carbonate Dust Deposition
Appendix 4A Groundwater Extraction and Well Permits
Appendix 4B Hydrology Report Proof of Groundwater Extraction
Appendix 5 Approved Revegetation Plan
Appendix 6A Informal Section 7 Consultation and Concurrence Sept 2000
Appendix 6B Biological Assessment May 2000
Appendix 6C1 Biological Survey 1997
Appendix 6C2 Biological Survey and Additional Correspondence
Appendix 6D Biological Survey Butterfield 3 Expansion Area Aug 2009
Appendix 6E Spotted Owl Updates
Appendix 7 Geology – Omya 1994
Appendix 8 Slope Stability Report CHJ 2012
Appendix 9A Archeological and Cultural Resource Surveys
Appendix 9B Cultural Resources Inventory 1984
Appendix 10 Approved Storm Water Monitoring Program – Cover and Approval Only
Appendix 11A Carbonate Plant Mitigation Proposal Feb 2012
Appendix 11B Details of the Rattler Mining Claims Relinquishment
Historical and Archaeology Report
Notice of Availability (Recirculation)
Appendix 1- Emissions Calculations
Appendix 1- Air Quality / GHG Report
Appendix 1- Construction and Basic Operations
Appendix 1- Paved Area Construction
Appendix 2a- Biological Assessment
Appendix 2b- Initial Biological Site Assessment Report
Appendix 2c- Presence Absence Report
Appendix 2d- Mohave Ground Squirrel Report
Appendix 3- Phase I Historical/Archaeological Resources Survey
Appendix 4a- Geotechnical Report
Appendix 4b- Geotechnical Report UPDATED
Appendix 5a- Hydrology Preliminary Drainage Study and Hydrology Report
Appendix 5b- Hydrology Report (part 1)
Appendix 5b- Hydrology Report (part 2)
Appendix 5c- Groundwater Sustainability Plan
If you wish to review the Notice of Availability and Initial Study, click here.
If you wish to review the Draft Mitigated Negative Declaration, click here.